Pedestal Crane Operator
Crane / Construction Vessel
Location: Various offshore
Start: ASAP
Duration: 5 months, then renewed for 12 months on agreement
Salary: Negotiable
Rotation: TBC (Unpaid home leave)
Working Week: 12 hrs p/day – 7 days p/week
Onboard Accommodation / Flights / Insurances provided by Client
Mandatory Requirements – Applications without these requirements can not be considered.
3 – 4 or more years of offshore experience as Offshore Pedestal Crane Operator
Stage 3 Certificate
Holding a IMCA Crane opt. Log Book ( or equivalent )
Experience with cranes lifting 200 – 250 tons is preferable
Expedience on subsea lifts or knuckle boom cranes
Operates and takes care of the pedestal crane onboard offshore construction vessels.
Operate the vessel pedestal crane within the designed crane load capacity, in accordance with the derating tables applicable to existing weather and sea state conditions
Perform basket transfers where permitted and safe to do so
Hold the Offshore Crane Operator certification (level 2 for unsupervised inboard lifts; level 3 for unsupervised offshore lifts), except for junior crane operators under training, who are not permitted to perform unsupervised lifts until the appropriate certification is obtained
Be aware of the surroundings in terms of potential clashes with other vessel equipment
Be aware of crane limits in terms of reach and capacity
On vessels with multiple cranes, be aware of the interaction with other cranes and proactively intervene in order to avoid any interference during simultaneous operations
Where present, and within the limits of own capabilities, operate the articulated boom on knuckle boom pedestal cranes
Where present, and within the limits of own capabilities, operate the active / passive heave compensation systems during lifting
Interact with the superiors in order to define the lifting procedures
Report any crane equipment malfunctioning to his/her supervisor
Ensures that all safe work procedures for crane lifts are adhered to
Make daily inspection on the crane
Carry out daily routine maintenance to the crane and the operator`s cabin
Keep a high level of housekeeping in the operator`s cabin
Liaise with 2nd Engineer/Crane Engineer/Chief Electrician/Vessel Equipment Engineer on crane maintenance and performance, in order to ensure that repairs and preventive maintenance are carried out properly
Carry out weekly inspection of the crane in accordance with the manufacturer`s recommendations
Fill up the crane log book as required for all lifts above 50 ton
Stop the lifting activity if required on safety or technical grounds, if continuing could cause any damages or injuries
Report to the 1st Assistant, while taking instructions directly from the Deck Foreman or 2nd Assistant during lifting operations